Install Instructions

Install Instructions For Athena Precision Products

Athena Precision Red Dot Plate Install Instructions

I- Ensure all surfaces and threads are

clean and free of debris. Apply a light coat of oil to the plate to prevent rusting.

II- Loctite 222 (purple) is recommended.

III- Apply a small drop of loctite to each screw, each threaded hole, & the front and rear contact points of the plate.

IV- Install using the supplied screws.

V- Very Important: Use a reliable torque driver set to the specified IN-LB value.

VI- Allow 24 hours for full cure.

  • Floorplate Installation Video